...

Construction Scheduling: Principles and Practices

Amazon.com Price: $165.32 (as of 21/03/2025 10:00 PST- Details)

Category:

This article is a complete, stand by myself reference for Undertaking control scheduling. It includes a distinctive aggregate of concepts/basics of scheduling and Undertaking control along side sensible programs and tutorials of the 4 such a lot not unusual scheduling instrument techniques–Microsoft Undertaking, Primavera Undertaking Planner (P3), SureTrak, P6 Undertaking Supervisor and Contractor. Having scheduling knowledge and instrument directions in a single ebook obviates the desire for 2 texts, and the workout routines and examples within the scheduling component are tied to the similar workout routines within the instrument parts.

Additional information

Author

Binding

Brand

EAN

EANList

Edition

IsAdultProduct

ISBN

ItemDimensions

Label

Languages

Manufacturer

MPN

NumberOfItems

NumberOfPages

PackageDimensions

PackageQuantity

PartNumber

ProductGroup

ProductTypeName

PublicationDate

Publisher

Studio